Olsen Ave- carport conversion

Designer

Studio Golden 

Specs

600 sf carport conversion, 1 bedroom 1 bath

Client feedback

"If you're looking to build an ADU in Tucson, I can't recommend Unstoppable Construction more. Amanda and Jon went above and beyond my already high expectations and built this place quickly and expertly. We were able to stay within our budget and desired timeframe, which isn't always the case for such a monumental project."

Forgeus St- historic charm

Designer

Tucson Design LLC 

Specs

432 sf sleeping quarters with 409 sf wrapround porch. Kitchenette, open shower, and powder room

Client feedback

"Much thanks to Amanda and Jon for helping us realize a
backyard art studio/casita for all of our projects waiting in
the wings! We greatly appreciate A&J’s approach to
supporting small-space living ideas at reasonable prices –
and prioritizing our bottom line rather than their own.
Worth every penny!!"

8th St- two units 

Specs

1000 sf 2 bedroom ADU and 153 sf studio sleeping quarters

More about this project 

Located near the University of Arizona, this project utilized pre-approved ADU designs from UIP. The Lumen is a 2 bedroom, 1000 sf unit and The Micro is 153 sf studio sleeping quarters with a loft. The owner selected matching finishes to visually unite the units. These will be student rentals. 

Terra Alta Blvd- eco friendly ADU

Designer

John Riggs AIA

Specs

600 sf one bedroom

This ADU is a third unit behind a duplex. Designed for maximum shading with energy efficient mechanical systems, upgraded insulation, and rainwater harvesting. The project was featured on the Tucson Rotary Club Green Homes Tour Spring 2024! 

More about this project

2nd St- masonry addition

Specs

1032 sf, masonry home addition in Sam Hughes historic neighborhood.  

More about this project 

Metal roof tie in with existing clay tile. Pine wood ceilings and sealed concrete floors. 6 months total construction schedule.

7th St- Sam Hughes custom home

Designer

Specs

 2932 sf two story custom home with a 4 car garage. 

More about this project 

One of the last lots to be built out in Sam Hughes! The agreement with the owner was for Unstoppable to complete the shell construction, finishes by owner. 

7th Ave- detached casita

C39A2E46-A349-45ED-980E-DB02FCB4CFB9 2.JPG
57A8A3E3-CED3-4345-9FF0-3C3022EF8717.JPG

Specs

400 sf, studio with loft. All electric. Wood frame and stucco construction. Metal hip roof. Pine wood ceiling. 

More about this project 

Located in beautiful Barrio Viejo, this project was completed in only 80 days and came in under budget.

Montecito St- garage conversion

IMG_3194_edited_edited.jpg
IMG_2003.JPG

 

Carport conversion to new unit for multi-generational family. Also added stucco to the front of the house to tie in the new unit.  Work was completed in 10 weeks including holidays through December and January. 

Designer

John Riggs, AIA

Client feedback

"Progress was steady and fun to watch. From beginning to end it only took 2 and a half months!

The finished project looks fantastic – I couldn’t be happier!"

Specs

250 sf carport conversion. Sleeping quarters. Coated concrete floors.